Gas Interconnection Poland–Lithuania pipeline

1/10/2019
Project development

€ 500 million

Announced

1/10/2019


Overview:

  • Gas Interconnection Poland–Lithuania pipeline
  • The project is being implemented by gas transmission system operators Amber Grid (Lithuania) and Gaz-System (Poland).
  • The construction of the gas pipeline started in October 2019, and is projected to be ready for operation by the end of 2021.